Summary: Additional above-ground main being installed near the top of Vanderlip Drive.
Current status: New main connected to water system on Dec. 11, 2024.
Crews are expanding the area in which above-ground main is installed along Vanderlip Drive to include the area near 85, 99, and 100 Vanderlip.